Ar

Tariffs for containers handling

Tariffs for containers handling.
Article 5: Container handling tariffs applied on shipping agent or receiver are determined as per following table no.2.
 


Table no. 2: Containers handling

Ref.

Description

Shipping agent or receiver US$/Container

20’

40’

Basic tariff

1st additional Port Charge

2nd additional Port Charge

New
tariff

Basic tariff

1st additional Port
Charge

2nd additional Port
Charge

New
tariff

*C1

Discharging or loading full container from or to vessel.

30

2.45

3.9

36.35

40

3.27

5.2

48.47

*C2

Transport of full or empty container from quay to container yard or vice versa.

6

0.49

0.78

7.27

10

0.82

1.3

12.12

*C3

Lift off or lift on (including stacking and stowing) of full container.

16

1.31

2.08

19.39

21

1.72

2.73

25.45

C4

Lift off or lift on (including stacking and stowing) of empty container.

8

0.65

1.04

9.69

11

0.90

1.43

13.33

C5

Discharging or loading empty container from or to vessel.

14

1.15

1.82

16.97

18

1.47

2.34

21.81

*C6

Transport of full or empty container from on board of vessel to container yard and vice versa. (Ro/Ro).

12

0.98

1.56

14.54

16

1.31

2.08

19.39

C7

Containers handling operation on quay: full containers (Use of extra equipment for loading or discharging).

8

0.65

1.04

9.69

12

0.98

1.56

14.54

C8

Containers handling operation on quay: empty containers (use of extra equipment for loading or discharging).

4

0.33

0.52

4.85

6

0.49

0.78

7.27

C9

Lift on and lift off of container from or to outside the port (receiver).

25

2.05

3.25

30.30

40

3.27

5.2

48.47

C10

Transporting a container to the weigh bridge and returning it to the container yard.

40

3.27

6.19

49.46

50

4.09

7.49

61.58

C11

Complete operation to shed for stripping (LCL).

54

4.42

8.01

66.43

70

5.73

10.09

85.82

C12

First customs survey including cost of seal.

20

1.64

3.6

25.24

25

2.05

4.25

31.30

C12+

2nd  customs survey

10.82

4.18

15

13.53

4.47

18

C13

Opening & closing vessel’s hatch covers from vessel to quay or vice-versa.

55

6.6

61.6

55

6.6

61.6

C14

Opening & closing vessel’s hatch covers.

55

6.6

61.6

55

6.6

61.6

C15

Restowing of full container from cell to cell.

30

2.45

3.9

36.35

40

3.27

5.20

48.47

C16

Restowing of empty container from cell to cell.

14

1.15

1.82

16.97

18

1.47

2.34

21.81

C17

Restowing of full container from cell to quay or vice-versa.

30

2.45

3.9

36.35

40

3.27

5.20

48.47

C18

Restowing of empty container from cell to quay or vice-versa.

14

1.15

1.82

16.97

18

1.47

2.34

21.81

C19

Extra fee for IMO container.

16

1.92

17.92

21

2.52

23.52

C20

Extra handling fee for leaking container 

27

3.24

30.24

27

3.24

30.24

C21

Discharging or loading full container by using special equipments (for each operation).

55

6.6

61.6

55

6.6

61.6

C22

Selecting empty container.

23

2.76

25.76

30

3.6

33.6

C23

Uncovering & covering the tarpaulin of open top container.

23

2.76

25.76

45

5.4

50.4

C24

Closing or opening the sides of flat container.

12

1.44

13.44

12

1.44

13.44

C25

Removing old labels from container (for each container).

8

0.96

8.96

8

0.96

8.96

C26

Placing new labels on container (for each label).

8

0.96

8.96

8

0.96

8.96

C27

Cleaning container.

15

1.8

16.8

23

2.76

25.76

C28

Transport fee of empty containers from/to container yard outside the port.

60

7.2

67.2

90

10.8

100.8

C29

Testing an empty refrigerated container for its filling for export with handling and electrical power supply maximum period of 2 hours

-

-

45.72

-

-

63.05

FRP *

Discharging or loading full container from or to vessel by vessel’s own gears or Ro/Ro vessels.

16.23

1.95

18.18

21.64

2.6

24.24

FRV

Discharging or loading empty container from or to vessel by vessel’s own gears or Ro/Ro vessels..

7.58

0.91

8.49

9.74

1.17

10.91

FCP *

Discharging or loading full container from or to vessel by vessel’s own gears or Ro/Ro vessels in container terminal.

21

1.72

2.73

25.45

28

2.29

3.64

33.93

FCV

Discharging or loading empty container from or to vessel by vessel’s own gears or Ro/Ro vessels at the terminal.

9.8

0.80

1.28

11.88

12.6

1.03

1.64

15.27


Article 6: The following remarks should be taken into consideration in application of article 5 (table no. 2):

  1. A- A rebate of 27% on codes marked with * in the table in case of exported or re exported containers by sea.
  1. B- Full containers handling on quay are compulsory when using shore cranes with capacity of 165 and 300 tons or using the vessel’s own gears.
  1. C- Operation C22 is a must whenever the receiver selects an empty container determined by number or specifications. Operation C22 dispenses of operation C4.
  1. D- The operation of C28 will be done when needed by decision of Beirut Port administration, and will be applied on the empty containers exceeding the number of empty containers -D- free of storage calculated as per the formula D=AxB of article (22).

                         C