Ar

Tariffs for containers handling

 

Article 5:

Container handling tariffs applied on shipping agent or consignee are determined as per following table no.2.
 

 

Extra fee for IMDG container.


Table no. 2: Containers handling

Ref.

Description

                                                   Shipping agent or consignee US$/Container

20’

40’

 

 

 


tariff

     


tariff

*C1

Discharging or loading full container from or to vessel.

 

 

 

36.35

     

48.47

*C2

Transport of full or empty container from quay to container yard or vice versa.

     

7.27

     

12.12

*C3

Lift off or lift on (including stacking and stowing) of full container.

     

19.39

     

25.45

C4

Lift off or lift on (including stacking and stowing) of empty container.

     

9.69

     

13.33

C5

Discharging or loading empty container from or to vessel.

     

16.97

     

21.81

*C6

Transport of full or empty container from on board of vessel to container yard and vice versa. (Ro/Ro).

     

14.54

     

19.39

C7

Containers handling operation on quay: full containers (Use of extra equipment for loading or discharging).

     

9.69

     

14.54

C8

Containers handling operation on quay: empty containers (use of extra equipment for loading or discharging).

     

4.85

     

7.27

C9

Lift on and lift off of container from or to outside the port (receiver).

     

30.30

     

48.47

C10

Transporting a container to the weigh bridge and returning it to the container yard.

     

49.46

     

61.58

C11

Complete operation to shed for stripping (LCL).

     

66.43

     

85.82

C12

First customs inspection including cost of seal, and return of container from CI      

28

     

35

C12+

2nd  customs survey

   

15

   

18

C13

Opening & closing vessel’s hatch covers from vessel to quay or vice-versa.

   

61.6

   

61.6

C14

Opening & closing vessel’s hatch covers.

   

61.6

   

61.6

C15

Restowing of full container from cell to cell.

     

36.35

     

48.47

C16

Restowing of empty container from cell to cell.

     

16.97

     

21.81

C17

Restowing of full container from cell to quay or vice-versa.

     

36.35

     

48.47

C18

Restowing of empty container from cell to quay or vice-versa.

     

16.97

     

21.81

C19

Extra fee for IMDG container.a.

     

17.92

     

23.52

C20

Extra handling fee for leaking container 

   

30.24

   

30.24

C21

Discharging or loading full container by using special equipments (for each operation).

   

61.6

   

61.6

C22

Selecting empty container.

   

25.76

   

33.6

C23

Uncovering & covering the tarpaulin of open top container.

   

25.76

   

50.4

C24

Closing or opening the sides of flat container.

   

13.44

   

13.44

C25

Removing old labels from container (for each container).

   

8.96

   

8.96

C26

Placing new labels on container (for each label).

   

8.96

   

8.96

C27

Cleaning container.

   

16.8

   

25.76

C28

Transport fee of empty containers from/to container yard outside the port.

   

67.2

   

100.8

C29

Testing an empty refrigerated container for its filling for export with handling and electrical power supply maximum period of 2 hours

    48.72     67.05

C30

Transporting of full container from Quay to yard, unloading then loading it, then return to Quay, as complimentary operation to C17     27     39

C31


Transporting of empty container from Quay to yard, unloading then loading it, then return to Quay, as complimentary operation to C18.
    17     26

FRP *

Discharging or loading full container from or to vessel by vessel’s own gears or Ro/Ro vessels.

   

18.18

   

24.24

FRV

Discharging or loading empty container from or to vessel by vessel’s own gears or Ro/Ro vessels..

   

8.49

   

10.91

FCP *

Discharging or loading full container from or to vessel by vessel’s own gears or Ro/Ro vessels in container terminal.

     

25.45

     

33.93

FCV

Discharging or loading empty container from or to vessel by vessel’s own gears or Ro/Ro vessels at the terminal.

     

11.88

     

15.27

 

Article 6:

The following remarks should be taken into consideration in application of article 5 (table no. 2):
A- A rebate of 27% on codes marked with * in the table in case of exported or re exported containers by sea.
B- Full containers handling on quay are compulsory when using mobile cranes with capacity of 165 and 300 tons or using the vessel’s own gears.
C- Operation C22 is a must whenever the receiver selects an empty container determined by number or specifications. Operation C22 dispenses of operation C4.
D- The operation of C28 will be done when needed by decision of Beirut Port administration, and will be applied on the empty containers exceeding the number of empty containers -D- free of storage calculated as per the formula of article (22).
E- In case operation C29 requested  more than 4 hours, shipping agent can issue a BTS “EC2H” (2 hours of electricity).
 

 

© 2025 Port of Beirut. All Rights Reserved. | Privacy Policy